23 oct. 2014

Chrysler Building (3)

Chrysler Building. 1/87 scale.
 The Chrysler Building in 1/87 scale, which as mentioned is part of the new railway scale layout "Grand Central of 600m2, is nearing completion. Morning proceed for completion of the roofs, and install the gargoyles. Lighting tests also take place tomorrow.
     We left some pictures of the construction of the building.

Greetings to all.
Chrysler Building. 1/87 scale.

Chrysler Building. 1/87 scale.

Chrysler Building. 1/87 scale.

12 oct. 2014

Mig-25 Foxtrot

Mig-25 Foxtrot

We finished the Diorama in 1/72 scale Mig-25 Foxtrot and it can be seen in the Exhibition Hall of the Museum.
         It is the second in a series of dioramas in 1/72 scale whose theme is modern aviation and specifically centered on the latter half of the twentieth century.
        We left some photographs.

A greeting.
Mig-25 Foxtrot

Mig-25 Foxtrot

Mig-25 Foxtrot

Mig-25 Foxtrot

9 oct. 2014

Dora gun 2

Dora. 1/35
Dora 1/35
 The German heavy artillery piece "Dora" in 1/35 scale is undoubtedly one of the best attractions of the Grand Central Museum. The total weight of the model base including diorama is 60 kg. However, the construction of a new diorama model for display is provided.
We left some pictures of the piece on the outside of the Museum. Hope you like.
a greeting
Dora 1/35

Dora 1/35

Dora 1/35

Dora 1/35

Dora 1/35

Dora 1/35

Dora 1/35

Dora 1/35

Dora 1/35

Dora 1/35

6 oct. 2014

Chrysler Building 2

 The works in the Chrysler Building in 1/87 scale continue at an excellent pace. Today we have taken a break and will resume work tomorrow and harder. For the weekend and we can see the building finished and finished lighting system.
      We left some photos.

A greeting.






3 oct. 2014

Chrysler Building

 
Chrysler Building 1/87

The first of the sixty-four skyscrapers under construction in Grand Central Museum is 90% finished. The new building Chrysler has peaked at 1050 feet tall elevation with vertex on the steel dome Nyrosta.
      The building is located over the two levels of the new railway Grand Central Terminal, equipped one hundred ninety two tracks, still under construction.


Chrysler Building 1/87